Pan African Projects Summary |
|||||||
|
|
|
Barberton Mines (South Africa) |
|
Name |
The Barberton mining operation |
|
Location |
Mpumalanga province (South Africa) |
|
Status |
Gold producer |
|
Holding Company |
Pan African Resources PLC (100% stake) |
|
Controlling Company |
Pan African Resources PLC |
|
Geological Setting |
Sediments and metavolcanics within the Barberton greenstone belt |
|
Products Mined |
Gold |
|
Actual Production |
Tons Per Annum: |
313,952 t |
|||||
Grade (recovered): |
9.4 g/t |
|||||||
Content Per Annum: |
94,909 oz |
|
Ongoing Capex |
£5 million per annum |
|
Extraction Method |
BIOX® / CIL |
|
LOM |
10 years |
|
Key Management |
Executive Mining: |
Ron Holding |
|||||
General Manager: |
Casper Strydom |
|
|
|
|
Links > |
Barberton Mines | Reserve Growth Projects | Barberton Resource Statement |
|
|
|
|
Phoenix Platinum Project (South Africa) |
|
Name |
The Phoenix Platinum CTRP |
|
Location |
North-West Province (South Africa) |
|
Status |
Construction |
|
Holding Company |
Phoenix Platinum Mining (Pty) Ltd |
|
Controlling Company |
Pan African Resources PLC (100% ownership) |
|
Geological Setting |
Chrome tailings discards from chrome seam mining in the Bushveld Igneous Complex |
|
Products Mined |
Platinum (56.5%), Palladium (27%), Rhodium (16%) and Gold (0.5%) |
|
Production Forecast |
Tons Per Annum: |
240,000t |
|||||
Head Grade (PGM’s) |
3.52g/t |
|||||||
Content Per Annum: |
12,200oz (PGM) @ 45% recovery |
|
Estimated Plant Capex |
£8.5 million |
|
Extraction Method |
CTRP: Concentrator/flotation plant |
|
LOM |
17 years |
|
Key Management |
Operations Manager: |
Ron Holding |
|||||
Project Manager: |
Richard Kunnemann |
|
|
|
|
Links > |
|
|
|
|
Manica Gold Project (Mozambique) |
|
Name |
The Manica gold project |
|
Location |
Manica Province (Mozambique) |
|
Status |
Pre-feasibility |
|
Holding Company |
Explorator Limitada |
|
Controlling Company |
Pan African Resources PLC (100% ownership) |
|
Geological Setting |
Sediments and metavolcanics within the Odzi-Mutare-Manica greenstone belt |
|
Products Mined |
Gold |
|
Production Forecast for a heap-leach surface mining operation |
Tons Per Annum: |
410,000t |
|||||
Grade: |
2.36g/t |
|||||||
Content Per Annum: |
30,000oz |
|
Estimated Capital Cost |
£48.58 million |
|
Extraction Method |
Pre-feasibility design is based on an optimised open pit mine design followed by underground mining applying a sublevel open stoping methodology. The project team is currently investigating the viability of heap leaching technology in order to enhance the project’s financial viability. |
|
LOM |
Pre feasibility design indicates 11 years at 80Koz gold per annum (heap-leach and underground mining option) |
|
Key Management |
Project Manager: |
Jan Nelson |
|
|
|
|
Links > |
|
|
UK (AIM): PAF | SA (JSE): PAN Tel: + 27 11 243 2900 |
Fax: + 27 11 880 1240 |
Copyright © Pan African Resources PLC 2011 | Disclaimer | Terms of use | Privacy