Manica Gold Project, Mozambique

The Manica licence area is situated in central Mozambique approximately 4km north of the town of Manica, which lies approximately 270km inland of the port city of Beira.

The licence area is centred on latitude 18°53’ degrees south and longitude 32°54’ east and lies close to the Mozambican border with Zimbabwe. The Zimbabwean town of Mutare is about 5km from the Mozambican-Zimbabwean border.

Manica is on the so-called “Beira Corridor”, a major road and rail route linking Zimbabwe with the Mozambican port of Beira on the Indian Ocean. The exploration project area is easily accessible by dirt road from Manica. Manica is served by sealed roads from Beira and from Harare in Zimbabwe. Scheduled air services link the nearby town of Chimoio with large regional centres such as Maputo, Harare and Beira.

   

Pan African Projects Summary

Manica Gold Project
> Location & Summary
> Resource Statement

Barberton Gold Mines
Phoenix Platinum

South Africa Country Profile
Mozambique Country Profile

 

         

 

       

 

     

Manica Gold Project (Mozambique)

 

 

       

Name

The Manica gold project

 

 

       

Location

Manica Province (Mozambique)

 

 

       

Status

Pre-feasibility

 

 

       

Holding Company

Explorator Limitada

 

 

       

Controlling Company

Pan African Resources PLC (100% ownership)

 

 

       

Geological Setting

Sediments and metavolcanics within the Odzi-Mutare-Manica greenstone belt

 

 

       

Products Mined*

Gold

 

 

       

Production Forecast for
a heap-leach surface
mining operation

Tons Per Annum:

410,000t

 

Grade:

2.36g/t

Content Per Annum:

30,000oz

 

       

Estimated Capital Cost

£48.58 million

 

 

       

Extraction Method

Pre-feasibility design is based on an optimised open pit mine design followed by underground mining applying a sublevel open stoping methodology. The project team is currently investigating the viability of heap leaching technology in order to enhance the project’s financial viability.

 

 

       

LOM

Pre feasibility design indicates 11 years at 80Koz gold per annum (heap-leach and underground mining option)

 

 

       

Key Management

Project Manager:

Mario Gericke

 

Metallurgical Consultant:

Karishma Sewpersad

 

         