The R325-million Barberton Tailings Retreatment Plant (BTRP) is located within the Fairview Mine’s footprint area. BTRP has been designed to treat 100,000 tonnes of tailings per month and adds low cost and low risk ounces to our production profile, with production of some 20,000oz per year at an AISC of USD643/oz. The current life of the operation is estimated at 9 years and has the added benefit of turning our Barberton environmental rehabilitation liabilities into profits.

Performance H1 FY20

OPERATIONAL & PERFORMANCE REVIEW 2019
0 Ounces
Gold Produced
0 oz/annum
~Annual capacity
0 $/oz
aisc
0
Employees
0
contractors
0 years
life of mine